Factory Direct Excavator Arm Boom Bucket Hydraulic Oil Cylinder for Lishide Sc330-8 Sc450-8 Sc485-8
Product Description
Part Name |
Excavator Hydraulic Cylinder Manufacturer |
Cylinder Model |
Sc330-8 Sc450-8 Sc485-8 |
Application |
for Lishide Excavator |
Warranty |
12 Months |
Quality |
OEM Quality |
Acting Way |
Double Acting Hydraulic Cylinder |
Product Parameters
SC330-8 arm cylinder rod |
120 |
SC330-8 arm cylinder tube |
170 |
SC330-8 bucket cylinder rod |
100 |
SC330-8 bucket cylinder tube |
140 |
SC330-8 boom cylinder rod |
100 |
SC330-8 boom cylinder tube |
140 |
SC450-8 arm cylinder rod |
130 |
SC450-8 arm cylinder tube |
190 |
SC450-8 bucket cylinder rod |
115 |
SC450-8 bucket cylinder tube |
170 |
1. With 16 years of manufacturing experience, Glparts delivers high-quality hydraulic cylinders backed by full-process quality control.
2. We offer both complete cylinder assemblies and individual components, including rods, barrels, seals, and raw materials like chrome rods and honed tubes.
3. Thanks to close cooperation with material suppliers, we ensure stable supply, competitive pricing, and consistent performance.
4. Glparts is committed to top-tier quality and responsive service to meet your hydraulic needs with confidence.
PRODUCTION PROCESS


FAQ
1.How can I be sure the part will fit my excavator ?
Give us correct model number /machine serial number /any numbers on the parts itself .Or measure the parts give us dimension or drawing.
2. What material do you use on hydraulic cylinder?
High frequency quenching No.40 manganese steel as rod material, so the cylinder rod has better bending resistance; No.25 manganese steel as tube material ,so the tube has better wear resistance; high-strength hardened steel as rod head and tube head ,so the cylinder head and rod head more durable; name-brand seal kits to reduce the hydraulic cylinder oil leakage rate.
3.How long can an order delivery?
For some often used models of excavator hydraulic cylinder , we have in stock, within 7 days . For any order less than one container takes about 2 weeks to finish; Order of 1-2 container takes 4 -6weeks; At busy manufacturing season, manufacturing time needs more which can confirm by discussion.
4.How to pay?
Order less than 3000USD, full payment at order, Order over USD3000 value ,50% deposited in to start, 50% balance paid to deliver. Inspection service accepted. For customized order, 70%payment as deposit ,30% balance paid to deliver
5.How to delivery?
If you have shipping agent ,we will cooperate with your agent to arrange shipment . If not , we have good relationships with shipping companies, express suppliers. For light goods ,by UPS/DHL/TNT(DAP terms) , For heavy goods ,by sea (FOB,CIF,CFR)